Modifications to Contract No. DE-AC09-02SR22210 with Parsons Infrastructure & Technology Group, Inc.

Modification Number Description
001 The purpose of this modification is to increase funding currently obligated to the contract.
002 The purpose of this modification is to revise Section C, paragraph C.5, Table C.5-1.1, Deliverables.
003 Updates the contract to reflect the extension of the Price-Anderson Act and its imlementing clause (DEAR 952.250-70).
004 The purpose of this modification is to increase funding currently obligated to the contract.
005 The purpose of this modification is to effect minor clarifications/changes to the DESCRIPTION/SPECIFICATIONS/WORK STATEMENT (SECTION C) and to delete the requirement for sensitivity review/analysis for a 1% scale facility and add the requirement for a 50% scale facility.
006 The purpose of this modification is to increase the estimated cost due to government directed changes in the SWPF feedbasis and monosodium titinate (MST) performance data, which required a re-work of the contractor's design. This action also adds additional funding to allow continued performance of the work.
007 The purpose of this modification is to increase funding currently obligated to the contract.
008 The purpose of this modification is to increase funding currently obligated to the contract and to update the Key Personnel list.
009 The purpose of this modification is to increase funding currently obligated to the contract.
010 This modification serves as a Change Order to the Contract. The Change Order increases the estimated total cost of the Contract cost to $8,642,281 and obligates additional funds in the amount of $810,070.
011 The purpose of this modification is to increase the estimated cost of the contract by $792,898 for Post Phase IB contract tasks/activities.
012 The purpose of this modification is to incorporate FAR 52.204-7 CENTRAL CONTRACTOR REGISTRATION - ALTERNATE I (OCT 2003).
013 The purpose of this modification is to increase the estimated cost of the contract by $1,042,951 for Post Phase IB contract tasks/activities.
014 This modification documents the authorization to proceed with Phase II, which includes preliminary and final design, construction, and commissioning (one year of operations). Updated Business Plan
015 This modification is issued to increase the estimated cost and fee of the contract by $6,710,747 for Phase IIA contract tasks and activities. Attachment - Scope of Work Salt Waste Processing Facility (SWPF) Enhanced Conceptual Design and Transition to Phase II
016 This modification deletes Section J, Attachment F, Key Personnel in its entirety and is replaced by this Key Personnel List.
017 The purpose of this modification is to increase funding currently obligated to the contract.
018 The purpose of this modification is to increase funding currently obligated to the contract and to update the Key Personnel List.
019 The purpose of this modification is to: (1) update DEAR 970.5215-3, Conditional Payment of Fee, Profit, or Incentives; (2) delete FAR 52.215-17, Waiver of Facilities Capital Cost of Money; (3) incorporate FAR 52.215-16, Facilities Capital Cost of Money; and (4) revise FAR 52.244-2, Subcontracts.
020 The purpose of this modification is to update section J, attachment F - Key Personnel.
021 The purpose of this modification is to increase funding currently obligated to the contract.
022 The purpose of this modification is to delete items 7.4 and 7.5 from Table C.5-1.1, Deliverables and delete PART I - THE SCHEDULE - SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT. Standards 7(g)(2) and (3) in their entirety.
023 This modification is issued to change B & R codes as shown below:
(1) 89X0251.91 EY3548140 ($1,000,000)
(2) 89X0251.91 EY1348010 $1,000,000
024 This modification is issued to incorporate this list of Government-Furnished Property and Vehicles.
025 The purpose of this modification is to increase funding currently obligated to the contract.
026 Modification 026 is issued as an undefinitized modification to Contract No. DE-AC09-02SR22210. Parsons shall stop work on the current Performance Category 2 (PC-2) final design (excluding the current technology development testing efforts), and immediately begin preparation of an Enhanced Preliminary Design (EPD) in which both the Central Processing Area (CPA) primary confinement systems and the CPA structures are designed to meet PC-3 requirements. The maximum ceiling price for the EPD is $32,880,220 and the maximum ceiling price for the final design, construction, and commissioning is $607,575,399.
027 The purpose of this modification is to increase funding currently obligated to the contract.
028 The purpose of this modification is to increase funding currently obligated to the contract.
029 This modification is issued to add DEAR 952.250-70 NUCLEAR HAZARDS INDEMNITY AGREEMENT (OCT 2005) to the contract (see pages 2-5 for the full text of the clause).
030 The purpose of this modification is to increase funding currently obligated to the contract.
031 The purpose of this modification is to update the Section J, Attachment F- Key Personnel and Attachment J- Government-Furnished Property.
032 The purpose of this modification is to update the Section J, Attachment F- Key Personnel.
033 This modification is issued to definitize the Enhanced Preliminary Design work authorized by Modificaiton No. M026.
034 The purpose of this modification is to increase funding currently obligated to the contract.
035 This modification clarifies that modification 015 changed the SWPF requirement from a 50% scale facility to a 100% scale facility. This modification also updates the Section J, Attachment F- Key Personnel and increases funding currently obligated to the contract.
036 The purpose of this modification is to update the Section J, Attachment F- Key Personnel.
037 The purpose of this modification is to: (1) increase funding currently obligated to the contract, (2) incorporate DOE Order 413.3A entitled "Program and Project Management for the Acquisition of Capital Assets", and (3) update the Key Personnel List (page 2).
038 The purpose of this modification is to increase funding currently obligated to the contract.
039 The purpose of this modification is to increase funding currently obligated to the contract.
040 The purpose of this modification is to increase funding currently obligated to the contract.
041 The purpose of this modification is to update Section C of the contract and to add the List of Applicable Directives.
042 The purpose of the modification is to increase funding currently obligated to the contract (page 2) and revise the Key Personnel List (page 3).
043 The purpose of this modification is to increase funding currently obligated to the contract.
044 The purpose of this modification is to increase funding currently obligated to the contract.
045 The purpose of this modification is to incorporate the Davis-Bacon Wage Determination applicable to the construction work required under this contract.
046 This modification is issued to revise the overtime premium amount authoized by Clause I.31, FAR 52.222-2 Payment of Overtime Premiums (JUL 1990), paragraph (a). The authorized overtime premium amount is increased to $500,000.
047 The purpose of this modification is to increase funding currently obligated to the contract.
048 The purpose of this modification is to revise Section J, Attachment F- Key Personnel (see page 2).
049 This modification is issued to: (1) correct Modification No. 047, (2) revise FAR 52.244-2 Subcontracts-Alternate II, (3) add FAR 52.234-4 Earned Value Management System, and (4) specify the formats for reporting Earned Value data.
050 The purpose of this modification is to increase funding currently obligated to the contract.
051 The purpose of this modification is to advise of changes in 10 CFR 707 which is invoked by DEAR 970.5223-4 (page 2), and to revise the Key Personnel list (page 3).
052 The purpose of this modification is to increase funding currently obligated to the contract.
053 The purpose of this modification is to increase funding currently obligated to the contract.
054 The purpose of this modification is to increase funding currently obligated to the contract.
055 The purpose of this modification is to make the following changes: A) Modification 054 incorporated DOE Manual 205.1-1 (Cyber Security Process Rrequirements Manual) dated 8-12-08. B) Correct manual number to read DOE Manual 205.1-5 (Cyber Security Process Requirements Manual) dated 8-12-08.
056 The purpose of this modification is to increase funding currently obligated to the contract.
057 The purpose of this modification is to make the following changes: A) Change paragraph 3.8.5 of the Statement of Work incorporated by Mod 041 to read: 3.8.5 Embedded process piping shall be designed for the life of the facility. Welds in embedded process piping shall be subject to 100% volumetric radiographic examination, except that welds in embedded process drain piping shall be subject to a minimum of 5% radiographic and 100% visual examination. Process piping in this context refers to piping in the process area of the facility. This is a no cost modification.
058 The purpose of this modification is to incorporate numerous changes listed on page 2.
059 The purpose of this modification is to increase funding currently obligated to the contract.
060 The purpose of this modification is to incorporate changes to DOE Order 205.1A, Department of Energy Cyber Security Management (12/04/2006). Cost to be negotiated by proposal submitted at a later date.
061 The purpose of this modification is to increase funding currently obligated to the contract.
062 The purpose of this modification is to increase funding currently obligated to the contract.
063 The purpose of this modification is to increase funding currently obligated to the contract.
064 The purpose of this modification is to increase funding currently obligated to the contract.
065 The purpose of this modification is to incorporate numerous changes listed on page 2.
066 The purpose of this modification is to make the following changes: A) Incorporate DOE Order 413.3A (Change 1, dated 11/17/2008), Program and Project Management of the Acquisition of Capital Assets and Incorporates DOE-STD 1189. B) Incorporate DEAR Clause 952.204-2 Security (June 2009), DEAR Clause 952.204-2 Security (Sep 1997) is hereby deleted in its entirety.
067 The purpose of this modification is to incorporate numerous changes listed on pages 1-3.
068 The purpose of this modification is to incorporate numerous changes listed on pages 1-2.
069 The purpose of this modification is to incorporate numerous changes listed on pages 1-2.
070 The purpose of this modification is to incorporate attachment 1 Project Management Controls, 14 Pages. FOB: Destination Period of Performance: 09/17/2002 to 11/15/2013.
071 The purpose of this modification is to make the following changes: (A) Incorporate FAR 52.222-54 Employment Eligibility Verification (Jan 2009), (B) Incorporate FAR 52.203-13 Contractor Code of Business Ethics and Conduct (Dec 2008). (C) Incorporate DOE Order 221.2A Cooperation with the Office of Inspector General (Feb 25, 2008) FOB: Destination - Period of Performance 09/17/2002 to 11/15/2013.
072 The purpose of this modification is to incorporate numerous changes listed on pages 1-3.
073 The purpose of this modification is to incorporate numerous changes listed on pages 1-2.
074 The purpose of this modification is to increase funding currently obligated to the contract.
075 The purpose of this modification is to increase funding currently obligated to the contract.
076 The purpose of this modification is to incorporate over 100 individual changes that are listed on the first several pages.
077 The purpose of this modification is to increase funding currently obligated to the contract.
078 The purpose of this modification is to increase funding currently obligated to the contract.
079 The purpose of this modification is to increase funding currently obligated to the contract.
080 The purpose of this modification is to deobligate $5,000,000 in FY 2010 OPC funding and obligate $5,000,000 in FY 2011 OPC Funding.
081 The purpose of this modification is to add incremental funding.
082 The purpose of this modification is to: (1) Definitize Contract Proposal Number V-PMP-J-00026, "New Transfer Line - Strip Effluent Sample Pumps to Existing CSSX (Strip Contractors), (2) Modify Section B.2 "Estimated Cost of the Contract and Fund Obligations", (3) Increase the Total Target Cost, Target Fee, Fixed Fee and Non Fee Bearing Cost for phases 1 and 2. (4) Modify Section C "Statement of Work" and (5) Modify Section J "List of Attachments."
083 The purpose of this modification is to incorporate the work authorized by the Contracting Officer on August 17, 2010.
084 The purpose of this modification is to make administrative changes to the contract in order to revise the total obligated amount specified on contract.
085 The purpose of this modification is to add incremental funding.
086 The purpose of this modification is to add incremental funding.
087 The purpose of this modification is to add incremental funding.
088 The purpose of this modification is to add incremental funding.
089 The purpose of this modification is to issue a change order revising the Statement of Work (SOW), and to make certain changes to the contract terms associated with the revised SOW.
090 The purpose of this modification is to issue a no cost change order revising Section J, List of Attachments, Attachment K- DEAR 970.5204-2 Laws, Regulations, and DOE Directives List of Applicable Directives (List B).
091 The purpose of this modification is to issue a change order revising the Statement of Work (SOW), and to make certain changes to the contract terms associated with the revised SOW.
092 The purpose of this modification is to add incremental funding.
093 The purpose of this modification is to incorporate FAR Clause 52.222-41 Service Contract Act of 1965 (Nov 2007).
094 The purpose of this modification is to: (1) Definitize Parsons Contract Proposal Number V-PMP-J-00025, "Add Two Strip Effluent Coalescer Feed Pumps", (2) Modify Section B.2 "Estimated Cost of the Contract and Fund Obligations", (3) Increase the Total Target Cost, Target Fee, Fixed Fee and Non Fee Bearing Cost for phases 1 and 2, and (4) Modify Section J, "List of Attachments".
095 The purpose of this modification is to issue a change order revising the Statement of Work (SOW), and to make certain changes to the contract terms associated with the revised SOW.
096 The purpose of this modification is to issue a change order revising the Statement of Work (SOW), and to make certain changes to the contract terms associated with the revised SOW.
097 The purpose of this modification is to revise section B of DE-AC09-02SR22210, Supplies or Services and Prices/Costs.
098 The purpose of this modification is to add incremental funding.
099 The purpose of this modification is to add incremental funding.
100 The purpose of this modification is to increase funding currently obligated to the contract.
101 The purpose of this modification is to increase funding currently obligated to the contract.
102 The purpose of this modification is to issue a no cost change order revising Section J, List of Attachments, Attachment K - DEAR 970.5204-2 Laws, Regulations, and DOE Directives List of Applicable Directives (List B).
103 Funding Only Action
104 The purpose of this modification is to make the following changes: (1) The change order modification that was submitted for additional Waste Transfer line recalculating pressure Mod 095 issued July 11, 2011 is hereby cancelled and the change order will not be definitized. (2) All cost to date for that change shall be submitted to DOE for approval. (3) The change order modification that was submitted for the additional mMST testing Mod 096 issued July 15, 2011 is hereby cancelled and the change order will not be definitized due to changes in the test matrix. (4) All cost to date for that change shall be submitted to DOE for approval.
105 Clause I -85 FAR 52.243-2 Changes Cost reimbursement Alt III
106 The purpose of this modification is to deobligate funding currently obligated to the contract.
107 Reason for Modification : Provide Incremental funding and update the key personnel list.
108 The purpose of this modification is to provide incremental funding.
109 The purpose of this modification is to make the following changes. Revise Section C, Description/Specifications/Work Statement. These revisions are being made under the authority of the contract clause contained in Section I, Clause I.85 Changes – Costs Reimbursement (Aug 1987) Alternate III (Apr 1984). This is a Bilateral modification.
110 The purpose of this modification is to provide incremental funding.
111 The purpose of this modification is to recognize that contractor's legal name change. The Contractor's name is changed from Parsons Infrastructure & Technology Group, Inc. to Parsons Government Services, Inc.
112 The purpose of this modification is to add the Office of Project Assessment as a recipient of the Contractors' Monthly Status Report.
113 The purpose of this modification is to provide incremental funding.
114 The purpose of this modification is to provide incremental funding.
115 The purpose of this modification is to adjust the funding on the contract.
116 The purpose of this modification is to make the following changes pursuant to FAR 52.232-22, Limitation of Funds (APR 1984) as a result of the Agreement in Principle signed on April 18, 2013 in response to Parsons’ Cost Overrun Proposal under a Constrained Funding Profile (V-PMP-J-00033, Rev.0) dated January 31, 2013 as modified on February 19, 2013 for CLIN 0005.
117 The purpose of this modification is to provide incremental funding.
118 Modification is to definitize a change order for Additional Next Generation Solvent testsing.
119 The purpose of this modification is to provide incremental funding.
120 Reason for Modification - Funding Only Action
121 The purpose of this modification is to provide incremental funding.
122 The purpose of this modification is to provide incremental funding.
123 The purpose of this modification is to provide incremental funding.
124 The purpose of this modification is to provide incremental funding.
125 The purpose of this modification is to provide incremental funding.
126 The purpose of this modification is to provide incremental funding.
127 The purpose of this modification is to provide incremental funding.
128 This modification is to incorporate DOE Order 414.1D as well as FAR 52.203-17 Whistleblower Clause into the Salt Waste Processing Facility Contract.
129 The purpose of this modification is to provide incremental funding.
130 Not Available
131 The purpose of this modification is to provide incremental funding.
132 The purpose of this modification is to provide incremental funding.
133 The purpose of this modification is to update the Key Personnel on the SWPF project.
134 The purpose of this modification is to provide incremental funding.
135 The purpose of this modification is to provide incremental funding.
136 The purpose of this modification is to provide incremental funding.
137 The purpose of this modification is to correct the total contract value.
138 The purpose of this modification is to correct the Bid Schedule to reflect modification 118 and correct the total value of the contract.
139 The purpose of this modification is to incorporate DOE O 420.1C Change 1 Facility Safety at no cost to the Government.
140 The purpose of this modification is to add funding to CLIN 0010 Target/Max Incentive Fee.
141 The purpose of this modification is to provide incremental funding.
142 The purpose of this modification is incorporate the Conference Management clause in section H at no cost to the Government.
143 The purpose of this modification is to: (A) Create CLIN 0010AE within the Schedule B to reflect the additional Scope of Work and funding that was added to NGS Testing in Modification 118.
144 The purpose of this modification is to provide incremental funding.
145 The purpose of this modification is to remove the inclusion of the Alph Finishing Process as part of the Design Capacity Performance Test form Section C Standard 5 Commissioning and One Year of Operations (F) (1).
146 The purpose of this modification is to provide incremental funding.
147 The purpose of this modification is to provide incremental funding.
148 The prupose of the modification is to issue a no cost change order revising Section J, List of Attachments, Attachment K - DEAR 970.5204-2 Laws, Regulations, and DOE Directives List of Applicable Directives (List B).
149 The purpose of this modification is to add incremental TEC funding.
150 The purpose of this modification is to incorporate ASME NQA-1 2008 and ASME NQA-1a-2009...
151 See Page 2 for a Description of the Modification.
152 The purpose of this modification is to provide incremental funding.
153 The purpose of this modification is to provide incremental funding.
154 The purpose of this modification is to provide incremental funding.
155 The purpose of this modification is to provide incremental funding.
156 Not Available
157 The purpose of this modification is to provide incremental funding.
158 The purpose of this modification is to provide incremental funding.

Please submit comments to Samuel Stewart