DOE Logo

Modifications to ESPC Delivery Order DE-AT09-09SR22572 Starting With Modification 001

Modification Number Description
001 Incorporate FAR Clauses and other changes
002 Changing the language in Delivery Order DE-AC09-09SR22572 Attachment #1
003 Incorporation of SCA Wage Determination 2005-2135 Rev11
004 Scope change for performance of #10 River Water Pump Replacement and #6 Motor Removal
005 Changes to the electical interconnection point for the power feeder from the biomass cogeneration facility
006 Removes S/RIDS development requirement
007 Revise work scope for two 3000 Kvars power factor correction capacitors at A-Area substation 751-3A and incorporate Ameresco DOE Directives Compliance Plan-Rev 0 as attachment #5 in Section J
008 DOE acceptance of ECM #1 and #2 and title transfer and changes to Ameresco Revised Final Proposal
009 Standard Large Generator Interconnection Agreement (LGIA) - Click to view the LGIA attachment

© U. S. Department of Energy - Savannah River Operations Office - 2014